Search results
Results with Valley Design-美国股票代码
Page 11 of 20. Found 193.
Public Information Centre #2
19 September 2023 Join us to learn about the study and provide feedback on the design options for the preferred solution.Date: Tuesday, September 19, 2023Time: 6 to 8 pmRegister your attendance
Discussion Paper Actions
Create design guidelines for outdoor amenity areas. Create family-friendly design guidelines for the interior design of high-rise buildings and units.
Complete online Survey & Ask a Question Tools
17 April 2023 Complete the online surveyHave a question about the HSR network re-design? Ask us using the online tool and we will respond as soon as we can.
What happens following the EA Study? When is construction anticipated to commence?
Design of the study recommendations will be advanced following the study throughout 2024 / 2025, with construction anticipated to commence in 2026 (subject to City's Capital Program (budget) and Council approval).
How will natural features, including species at risk, be impacted?
Aquatic and terrestrial desktop and field investigations have been completed, to establish baseline conditions that will be considered in the evaluation of alternative design concepts to be presented at PIC #2.
Planning Language 101
to guide land development to achieve a desired level of design quality.
How existing Hydro One infrastructure being considered?
Feedback from Hydro One will be considered in the preliminary preferred design concept to be presented at PIC #2
Planning Committee
22 March 2022 Planning staff will be presenting the final recommended Waterdown Community Node Secondary Plan, Urban Design Guidelines, and Implementing Zoning Changes at a virtual public meeting of the City of Hamilton’s Planning Committee.
Do you have a question about this project?
This cost is subject to change based on further evaluation of the preferred alternative route during the detailed design phase.When will construction take place?Construction is planned to begin after the two-year design and planning phase.
Alexander Park Clubhouse Renewal Update
Based on the feedback and comments compiled from the survey, the City is moving forward with a ‘hybrid design’ option for the Alexander Park Clubhouse.This hybrid design includes the covered patio from Option 1 and maintains sight lines from the playground